High spec refurbishment to an existing tenanted city centre office block. High specification finishes including metal ceilings and raised access floors are installed throughout following the initial demolition and asbestos removal. A dedicated plant deck was installed on the roof with a fully louvered perimeter, together with feature deckling and balustrade on the terrace.
Office Refurbishment & Extension, Leeds
For Wilton Developments works included asbestos removal, internal demolition & strip out, new finishes throughout including raised access floors, new services installations, roof top extension to create a 4th floor and ground floor remodelling & elevations.
Proposed Enterprise Centre, Eccleshill
Construction of a two storey community building consisting of small managed workspaces / meeting rooms and a 2 storey managed workspace unit. Both buildings we’re steel framed construction and clad externally with straw bales and render/cedar. Fully fitted out with a complete M & E Installation along with External works, drainage and access road to serve the development.