Demolition of various buildings and strip off existing roofs to facilitate new stone built activity barn and curtain walled link corridor along with new Kingspan cladding to the roof, the over clad of the existing building with Cedar cladding and locally sourced stone-slips. New steel frame, concrete, mezzanine structure within the main building and a full overhaul/reinstatement of the external works.